@inproceedings{bfc536a1c0914159aa2dcb2d4d320357,
title = "Wind power plant testing and commissioning",
abstract = "Complete testing and commissioning of the wind plant collector system is a critical step to ensure all equipment and systems are in proper working order prior to system energization and operation. In addition a comprehensive test agenda will ensure baseline data is available for comparing with future test data obtained during normally scheduled maintenance outages. This paper provides a thorough description and methodology for complete testing and commissioning of the wind plant medium voltage collector system and the equipment internal to the wind turbine itself.",
keywords = "Rho, Wind power plant, commissioning, power cable, resistivity, testing",
author = "M. Bradt and W. Dilling and B. Lanz and K. Louis and T. Nicolai and M. Starke",
year = "2011",
doi = "10.1109/PES.2011.6039424",
language = "English",
isbn = "9781457710018",
series = "IEEE Power and Energy Society General Meeting",
booktitle = "2011 IEEE PES General Meeting",
note = "2011 IEEE PES General Meeting: The Electrification of Transportation and the Grid of the Future ; Conference date: 24-07-2011 Through 28-07-2011",
}