Wind power plant testing and commissioning

M. Bradt, W. Dilling, B. Lanz, K. Louis, T. Nicolai, M. Starke

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

2 Scopus citations

Abstract

Complete testing and commissioning of the wind plant collector system is a critical step to ensure all equipment and systems are in proper working order prior to system energization and operation. In addition a comprehensive test agenda will ensure baseline data is available for comparing with future test data obtained during normally scheduled maintenance outages. This paper provides a thorough description and methodology for complete testing and commissioning of the wind plant medium voltage collector system and the equipment internal to the wind turbine itself.

Original languageEnglish
Title of host publication2011 IEEE PES General Meeting
Subtitle of host publicationThe Electrification of Transportation and the Grid of the Future
DOIs
StatePublished - 2011
Externally publishedYes
Event2011 IEEE PES General Meeting: The Electrification of Transportation and the Grid of the Future - Detroit, MI, United States
Duration: Jul 24 2011Jul 28 2011

Publication series

NameIEEE Power and Energy Society General Meeting
ISSN (Print)1944-9925
ISSN (Electronic)1944-9933

Conference

Conference2011 IEEE PES General Meeting: The Electrification of Transportation and the Grid of the Future
Country/TerritoryUnited States
CityDetroit, MI
Period07/24/1107/28/11

Keywords

  • Rho
  • Wind power plant
  • commissioning
  • power cable
  • resistivity
  • testing

Fingerprint

Dive into the research topics of 'Wind power plant testing and commissioning'. Together they form a unique fingerprint.

Cite this