Wind power plant testing and commissioning

M. Bradt, E. Beckman, W. Dilling, B. Lanz, K. Louis, T. Nicolai, M. Starke, C. Moeller

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

2 Scopus citations

Abstract

Complete testing and commissioning of the wind plant collector system is a critical step to ensure all equipment and systems are in proper working order prior to system energization and operation. In addition a comprehensive test agenda will ensure baseline data is available for comparing with future test data obtained during normally scheduled maintenance outages. This paper provides an overview and basic methodology for testing and commissioning of the wind plant medium voltage collector system.

Original languageEnglish
Title of host publication2012 IEEE PES Transmission and Distribution Conference and Exposition, T and D 2012
DOIs
StatePublished - 2012
Event2012 IEEE PES Transmission and Distribution Conference and Exposition, T and D 2012 - Orlando, FL, United States
Duration: May 7 2012May 10 2012

Publication series

NameProceedings of the IEEE Power Engineering Society Transmission and Distribution Conference
ISSN (Print)2160-8555
ISSN (Electronic)2160-8563

Conference

Conference2012 IEEE PES Transmission and Distribution Conference and Exposition, T and D 2012
Country/TerritoryUnited States
CityOrlando, FL
Period05/7/1205/10/12

Keywords

  • Rho
  • Wind power plant
  • commissioning
  • power cable
  • resistivity
  • testing

Fingerprint

Dive into the research topics of 'Wind power plant testing and commissioning'. Together they form a unique fingerprint.

Cite this