@inproceedings{4c7fd71603fd4f5b89212cc43219cfdf,
title = "Wind power plant testing and commissioning",
abstract = "Complete testing and commissioning of the wind plant collector system is a critical step to ensure all equipment and systems are in proper working order prior to system energization and operation. In addition a comprehensive test agenda will ensure baseline data is available for comparing with future test data obtained during normally scheduled maintenance outages. This paper provides an overview and basic methodology for testing and commissioning of the wind plant medium voltage collector system.",
keywords = "Rho, Wind power plant, commissioning, power cable, resistivity, testing",
author = "M. Bradt and E. Beckman and W. Dilling and B. Lanz and K. Louis and T. Nicolai and M. Starke and C. Moeller",
year = "2012",
doi = "10.1109/TDC.2012.6281620",
language = "English",
isbn = "9781467319348",
series = "Proceedings of the IEEE Power Engineering Society Transmission and Distribution Conference",
booktitle = "2012 IEEE PES Transmission and Distribution Conference and Exposition, T and D 2012",
note = "2012 IEEE PES Transmission and Distribution Conference and Exposition, T and D 2012 ; Conference date: 07-05-2012 Through 10-05-2012",
}