Original language | English |
---|---|
Pages (from-to) | 638-639 |
Number of pages | 2 |
Journal | Transactions of the American Nuclear Society |
Volume | 105 |
State | Published - 2011 |
Event | 2011 ANS Annual Winter Meeting and Embedded Topical Meetings: 1st ANS SMR 2011 Conference and Young Professionals Congress 2011 - Washington, DC, United States Duration: Oct 30 2011 → Nov 3 2011 |
Using the throughput, reliability, availability, and maintainability (TRAM) methodology to predict and relieve "gridlock" in process plant material flow
J. J. Nutaro, J. C. Schryver, M. J. Haire, D. L. Lee
Research output: Contribution to journal › Conference article › peer-review