TY - GEN
T1 - Time-quality analysis of spatial data processing for bridge management
AU - Tang, Pingbo
AU - Shen, Zhenglai
N1 - Publisher Copyright:
© ASCE 2014.
PY - 2014
Y1 - 2014
N2 - Delays in delivering spatial information to support the decisions about maintenance of bridges introduce stoppages into the bridge management workflow. Previous studies show that spatial data collection and analysis are major components of these inspection programs. However, the time-consuming spatial data processing causes days or weeks of delays in delivering the needed spatial information. Federal agencies, in many cases, either wait for the tedious spatial data processing or use partial data processing results containing high uncertainties. Using the processing of 3D laser scanning point clouds as an example, this paper examines the technical feasibility and scientific challenges of quantifying the data processing time and the quality (e.g., accuracy) of derived information (e.g., minimum under-clearance of a bridge) useful for bridge management. Different decisions need different geometric attributes and relationships with various accuracy requirements. The optimal data processing strategy varies with the needed information quality and time limits. It is difficult to manually analyze the time-quality trade-offs of spatial data processing due to its ad-hoc nature and large number of possible parameter settings in data processing workflows. The authors proposed a computational framework that automatically records data processing histories of engineers along with the engineering needs. Analyzing those histories lead to insights into the trade-offs between required computational complexity/time and quality of delivered spatial information. This paper presents time-quality analysis results from two bridge inspection cases.
AB - Delays in delivering spatial information to support the decisions about maintenance of bridges introduce stoppages into the bridge management workflow. Previous studies show that spatial data collection and analysis are major components of these inspection programs. However, the time-consuming spatial data processing causes days or weeks of delays in delivering the needed spatial information. Federal agencies, in many cases, either wait for the tedious spatial data processing or use partial data processing results containing high uncertainties. Using the processing of 3D laser scanning point clouds as an example, this paper examines the technical feasibility and scientific challenges of quantifying the data processing time and the quality (e.g., accuracy) of derived information (e.g., minimum under-clearance of a bridge) useful for bridge management. Different decisions need different geometric attributes and relationships with various accuracy requirements. The optimal data processing strategy varies with the needed information quality and time limits. It is difficult to manually analyze the time-quality trade-offs of spatial data processing due to its ad-hoc nature and large number of possible parameter settings in data processing workflows. The authors proposed a computational framework that automatically records data processing histories of engineers along with the engineering needs. Analyzing those histories lead to insights into the trade-offs between required computational complexity/time and quality of delivered spatial information. This paper presents time-quality analysis results from two bridge inspection cases.
UR - http://www.scopus.com/inward/record.url?scp=84934277849&partnerID=8YFLogxK
U2 - 10.1061/9780784413616.112
DO - 10.1061/9780784413616.112
M3 - Conference contribution
AN - SCOPUS:84934277849
T3 - Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference on Computing in Civil and Building Engineering
SP - 900
EP - 908
BT - Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference on Computing in Civil and Building Engineering
A2 - Issa, R. Raymond
A2 - Flood, Ian
PB - American Society of Civil Engineers (ASCE)
T2 - 2014 International Conference on Computing in Civil and Building Engineering
Y2 - 23 June 2014 through 25 June 2014
ER -