Abstract
The Proton Power Upgrade (PPU) project at the Spallation Neutron Source (SNS) aims to enhance the linear accelerator's power output from 1.4 to 2.8 megawatts. A critical focus lies on upgrading the Extraction Kicker Power Supplies to handle the amplified beam power. The existing capacitor charging power supplies lacked the capability to charge the Blumlein-type Pulse Forming Network (PFN) to the required 40 kV at a repetition rate of 60 Hz. To address this limitation, an initial solution involving the use of a resonant charging circuit was proposed. However, a challenge arose with a self-firing issue in the thyristor switch, which proved unsolvable within the given timeframe. Facing a critical decision point in the project, an alternative approach was explored: integrating a supplementary power supply to enhance the overall power capacity. This solution was tested and ultimately chosen as the path forward. To accommodate the additional power supply, the power distribution system had to undergo upgrades. Throughout this endeavor, a comprehensive examination of the system took place, with meticulous identification of key components. This paper delves into the technical challenges encountered during the process and the corresponding solutions that were implemented.
| Original language | English |
|---|---|
| Title of host publication | 2024 IEEE International Power Modulator and High Voltage Conference, IPMHVC 2024 |
| Publisher | Institute of Electrical and Electronics Engineers Inc. |
| ISBN (Electronic) | 9798350348538 |
| DOIs | |
| State | Published - 2024 |
| Externally published | Yes |
| Event | 2024 IEEE International Power Modulator and High Voltage Conference, IPMHVC 2024 - Indianapolis, United States Duration: May 28 2024 → Jun 1 2024 |
Publication series
| Name | 2024 IEEE International Power Modulator and High Voltage Conference, IPMHVC 2024 |
|---|
Conference
| Conference | 2024 IEEE International Power Modulator and High Voltage Conference, IPMHVC 2024 |
|---|---|
| Country/Territory | United States |
| City | Indianapolis |
| Period | 05/28/24 → 06/1/24 |
Funding
This manuscript has been authored by UT-Battelle, LLC, under contract DEAC05-00OR22725 with the US Department of Energy (DOE). The publisher acknowledges the US government license to provide public access under the DOE Public Access Plan (http://energy.gov/downloads/doe-public-accessplan. The authors wish to express their gratitude to the following individuals: Austin Bullman, Fred Carden, Alex Groff, Crystal Rayburn, Brian Reagan, Johnny Tang, and Joey Weaver.
Keywords
- Extraction Kicker
- Proton Power Upgrade
Fingerprint
Dive into the research topics of 'The Upgrade of the SNS Extraction Kicker Power Supplies for the Proton Power Upgrade'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver