The commissioning plan for the spallation neutron source ring and transport lines

  • S. Henderson
  • , S. Assadi
  • , S. Cousineau
  • , G. Dodson
  • , V. Danilov
  • , J. Galambos
  • , J. Holmes
  • , K. Reece
  • , T. Shea
  • , D. Raparia
  • , M. Blaskiewicz
  • , Y. Y. Lee
  • , Y. Papaphilippou
  • , J. Wei

Research output: Contribution to conference › Paper › peer-review

Abstract

The Spallation Neutron Source (SNS) accelerator systems will provide a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron production. In order to satisfy the accelerator systems' portion of the Critical Decision 4 (CD-4) commissioning goal (which marks the completion of the construction phase of the project), a beam pulse with intensity greater than 1×10 13 protons must be accumulated in the ring, extracted in a single rum and delivered to the target. A commissioning plan has been formulated for bringing into operation and establishing nominal operating conditions for the various ring and transport line subsystems as well as for establishing beam conditions and parameters which meet the commissioning goal.

Original languageEnglish
Pages1569-1571
Number of pages3
StatePublished - 2003
EventPAC 2003 - Proceedings of the 2003 IEEE Particle Accelerator Conference - Portland, OR, United States
Duration: May 12 2003 → May 16 2003

Conference

ConferencePAC 2003 - Proceedings of the 2003 IEEE Particle Accelerator Conference
Country/TerritoryUnited States
CityPortland, OR
Period05/12/03 → 05/16/03

Fingerprint

Dive into the research topics of 'The commissioning plan for the spallation neutron source ring and transport lines'. Together they form a unique fingerprint.

Cite this