TY - GEN
T1 - Summary of FY 2024 A709 Code Case testing at ANL, INL and ORNL
AU - Wang, Yanli
AU - Fan, Xuesong
PY - 2024/9
Y1 - 2024/9
N2 - A collaborative research and development effort in support of the Alloy 709 Code Case qualification in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, Division 5, High Temperature Reactors is being carried out at Oak Ridge National Laboratory (ORNL), Idaho National Laboratory (INL), and Argonne National Laboratory (ANL). Key testing data for the Alloy 709 100,000-hr near-term Code Case submittal to ASME is expected to be completed by the end of 2024, with design parameters anticipated to be finalized in FY 2025. This report summarizes the testing results for three commercial heats of Alloy 709 conducted across three laboratories, reviews the current testing status, and outlines the remaining data needed to support the first Alloy 709 Code Case submittal to ASME. The Alloy 709 Code Case plan remains on schedule.
AB - A collaborative research and development effort in support of the Alloy 709 Code Case qualification in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, Division 5, High Temperature Reactors is being carried out at Oak Ridge National Laboratory (ORNL), Idaho National Laboratory (INL), and Argonne National Laboratory (ANL). Key testing data for the Alloy 709 100,000-hr near-term Code Case submittal to ASME is expected to be completed by the end of 2024, with design parameters anticipated to be finalized in FY 2025. This report summarizes the testing results for three commercial heats of Alloy 709 conducted across three laboratories, reviews the current testing status, and outlines the remaining data needed to support the first Alloy 709 Code Case submittal to ASME. The Alloy 709 Code Case plan remains on schedule.
U2 - 10.2172/2455079
DO - 10.2172/2455079
M3 - Technical Report
CY - United States
ER -