T1 - Status report on the installation of the warm sections for the superconducting linac at the SNS
AU - Kersevan, Roberto
AU - Briggs, Dayrl P.
AU - Campisi, Isidore Enrico
AU - Crandall, John A.
AU - Douglas, Debra L.
AU - Hunter, Ted
AU - Ladd, Peter
AU - Luck, Chris
AU - Morton, Robert C.
AU - Russell, Kathy S.
AU - Stout, Daniel
PY - 2005
Y1 - 2005
N2 - The SNS superconducting linac (SCL) consists of 23 cryomodules (CMs), with possibly 9 additional CMs being added for future energy upgrade from 1 GeV to 1.3 GeV[1, 2]. A total of 32 warm sections separate the comparatively short CMs, and this allows a CM exchange within 48 hours, in order to meet demanding beam availability specifications. The 32 warm section chambers are installed between each pair of CMs, with each section containing a quadrupole doublet, beam diagnostics, and pumping [3]. The chambers are approximately 1.6 m long, have one bellows installed at each end for alignment, and are pumped by one ion-pump. The preparation and installation of these chambers must be made under stringent clean and particulate-free conditions, in order to ensure that the performance of the SCL CMs is not compromised. This paper discusses the development of the cleaning, preparation, and installation procedures that have been adopted for the warm sections, and the vacuum performance of the system.
AB - The SNS superconducting linac (SCL) consists of 23 cryomodules (CMs), with possibly 9 additional CMs being added for future energy upgrade from 1 GeV to 1.3 GeV[1, 2]. A total of 32 warm sections separate the comparatively short CMs, and this allows a CM exchange within 48 hours, in order to meet demanding beam availability specifications. The 32 warm section chambers are installed between each pair of CMs, with each section containing a quadrupole doublet, beam diagnostics, and pumping [3]. The chambers are approximately 1.6 m long, have one bellows installed at each end for alignment, and are pumped by one ion-pump. The preparation and installation of these chambers must be made under stringent clean and particulate-free conditions, in order to ensure that the performance of the SCL CMs is not compromised. This paper discusses the development of the cleaning, preparation, and installation procedures that have been adopted for the warm sections, and the vacuum performance of the system.
UR - http://www.scopus.com/inward/record.url?scp=33847109023&partnerID=8YFLogxK
U2 - 10.1109/PAC.2005.1591637
DO - 10.1109/PAC.2005.1591637
M3 - Conference contribution
AN - SCOPUS:33847109023
SN - 0780388593
SN - 9780780388598
T3 - Proceedings of the IEEE Particle Accelerator Conference
SP - 3828
EP - 3830
BT - Proceedings of the Particle Accelerator Conference, PAC 2005
T2 - Particle Accelerator Conference, PAC 2005
Y2 - 16 May 2005 through 20 May 2005
ER -