Abstract
The Proton Power Upgrade (PPU) project [1,2,3] will double the accelerator power capability at Spallation Neutron Source (SNS) [4], from 1.4 to 2.8 MW. This project received initial funding in 2018, and plans have been formulated to complete equipment installation and begin beam commissioning in 2024. The project plans and status, with an emphasis on recent progress, are summarized for the different sub-systems.
Original language | English |
---|---|
Title of host publication | Proceedings of the 29th Linear Accelerator Conference, LINAC 2018 |
Publisher | JACoW Publishing |
Pages | 24-28 |
Number of pages | 5 |
ISBN (Electronic) | 9783954501946 |
DOIs | |
State | Published - 2020 |
Event | 29th International Linear Accelerator Conference, LINAC 2018 - Beijing, China Duration: Sep 16 2018 → Sep 21 2018 |
Publication series
Name | Proceedings of the 29th Linear Accelerator Conference, LINAC 2018 |
---|
Conference
Conference | 29th International Linear Accelerator Conference, LINAC 2018 |
---|---|
Country/Territory | China |
City | Beijing |
Period | 09/16/18 → 09/21/18 |
Funding
* ORNL is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. This research was supported by the DOE Office of Science, Basic Energy Science, Scientific User Facilities. † [email protected] ORNL is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. This research was supported by the DOE Office of Science, Basic Energy Science, Scientific User Facilities.