Status of the SNS proton power upgrade project

J. Galambos, M. Champion, M. Connell, M. Howell, S. Kim, J. Moss, M. Plum, B. Riemer, W. Steffey, K. White

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Scopus citations

Abstract

The Proton Power Upgrade (PPU) project [1,2,3] will double the accelerator power capability at Spallation Neutron Source (SNS) [4], from 1.4 to 2.8 MW. This project received initial funding in 2018, and plans have been formulated to complete equipment installation and begin beam commissioning in 2024. The project plans and status, with an emphasis on recent progress, are summarized for the different sub-systems.

Original languageEnglish
Title of host publicationProceedings of the 29th Linear Accelerator Conference, LINAC 2018
PublisherJACoW Publishing
Pages24-28
Number of pages5
ISBN (Electronic)9783954501946
DOIs
StatePublished - 2020
Event29th International Linear Accelerator Conference, LINAC 2018 - Beijing, China
Duration: Sep 16 2018Sep 21 2018

Publication series

NameProceedings of the 29th Linear Accelerator Conference, LINAC 2018

Conference

Conference29th International Linear Accelerator Conference, LINAC 2018
Country/TerritoryChina
CityBeijing
Period09/16/1809/21/18

Funding

* ORNL is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. This research was supported by the DOE Office of Science, Basic Energy Science, Scientific User Facilities. † [email protected] ORNL is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. This research was supported by the DOE Office of Science, Basic Energy Science, Scientific User Facilities.

Fingerprint

Dive into the research topics of 'Status of the SNS proton power upgrade project'. Together they form a unique fingerprint.

Cite this