S. Henderson, A. Aleksandrov, D. Anderson, S. Assadi, I. Campisi, F. Casagrande, M. Champion, R. Cutler, V. Danilov, G. Dodson, D. Everitt, J. Galambos, J. Haines, J. Holmes, T. Hunter, D. Lousteau, N. Holtkamp, D. Jeon, S. Kim, T. MannM. McCarthy, T. McManamy, G. Murdoch, M. Plum, B. Riemer, M. Stockli, D. Stout, R. Welton

Research output: Contribution to conferencePaperpeer-review

12 Scopus citations

Abstract

The baseline Spallation Neutron Source (SNS) accelerator complex, consisting of an H- injector, a 1 GeV linear accelerator, and an accumulator ring, will provide a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron production. Even in the baseline design, many of the accelerator subsystems are capable of supporting higher beam intensities and higher beam energy. Upgrades to the SNS accelerator and target systems to increase the beam power to at least 2 MW, with a design goal of 3 MW, are in the planning stages. The upgrade beam parameters will be presented and the required hardware modifications will be described.

Original languageEnglish
Pages345-347
Number of pages3
StatePublished - 2006
Externally publishedYes
Event10th European Particle Accelerator Conference, EPAC 2006 - Edinburgh, United Kingdom
Duration: Jun 26 2006Jun 30 2006

Conference

Conference10th European Particle Accelerator Conference, EPAC 2006
Country/TerritoryUnited Kingdom
CityEdinburgh
Period06/26/0606/30/06