TY - GEN
T1 - Status of the cryogenic system commissioning at SNS
AU - Casagrande, F.
AU - Campisi, I.
AU - Gurd, P.
AU - Hatfield, D.
AU - Howell, M.
AU - Stout, D.
AU - Strong, H.
AU - Arenius, D.
AU - Creel, J.
AU - Dixon, K.
AU - Ganni, V.
AU - Knudsen, P.
PY - 2005
Y1 - 2005
N2 - The Spoliation Neutron Source (SNS) is under construction at Oak Ridge National Laboratory. The cold section of the Linac consists of 81 superconducting radio frequency cavities cooled to 2.1K by a 2400 Watt cryogenic refrigeration system. The major cryogenic system components include warm helium compressors with associated oil removal and gas management, 4.5K cold box, 7000L liquid helium dewar, 2.1K cold box (consisting of 4 stages of cold compressors), gaseous helium storage, helium purification and gas impurity monitoring system, liquid nitrogen storage and the cryogenic distribution transfer line system. The overall system commissioning strategy and status will be presented.
AB - The Spoliation Neutron Source (SNS) is under construction at Oak Ridge National Laboratory. The cold section of the Linac consists of 81 superconducting radio frequency cavities cooled to 2.1K by a 2400 Watt cryogenic refrigeration system. The major cryogenic system components include warm helium compressors with associated oil removal and gas management, 4.5K cold box, 7000L liquid helium dewar, 2.1K cold box (consisting of 4 stages of cold compressors), gaseous helium storage, helium purification and gas impurity monitoring system, liquid nitrogen storage and the cryogenic distribution transfer line system. The overall system commissioning strategy and status will be presented.
UR - https://www.scopus.com/pages/publications/33847141827
U2 - 10.1109/PAC.2005.1590628
DO - 10.1109/PAC.2005.1590628
M3 - Conference contribution
AN - SCOPUS:33847141827
SN - 0780388593
SN - 9780780388598
T3 - Proceedings of the IEEE Particle Accelerator Conference
SP - 970
EP - 972
BT - Proceedings of the Particle Accelerator Conference, PAC 2005
T2 - Particle Accelerator Conference, PAC 2005
Y2 - 16 May 2005 through 20 May 2005
ER -