The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is preparing for the Proton Power Upgrade (PPU) project to increase the output energy of the accelerator from 1.0 GeV to 1.3 GeV. As part of this project with the combination of increasing the output energy and beam current, the beam power capability will be doubled from 1.4MW to 2.8MW. In this project, seven new high beta cryomodules housing 28 superconducting niobium cavities will be added to the LINAC tunnel. Lessons learned from over ten years of operation will be incorporated into the new cryomodule and cavity design. The design and the fabrication of these cryomodules and how these will be integrated into the existing accelerator will be detailed in this paper.
Original language | English |
---|---|
Article number | 012185 |
Journal | IOP Conference Series: Materials Science and Engineering |
Volume | 278 |
Issue number | 1 |
DOIs | |
State | Published - Dec 30 2017 |
Event | 2017 Cryogenic Engineering Conference, CEC 2017 - Madison, United States Duration: Jul 9 2017 → Jul 13 2017 |
Funding
This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE.