Abstract
This appendix documents the status of the ORNL Phase 1 DE activities [C-2,C-3] related to rod internal pressure and void volume measurement techniques and fission gas stack flow measurements applied to selected sister rods in Phase 1 of the sister rod test program.
| Original language | English |
|---|---|
| Place of Publication | United States |
| DOIs | |
| State | Published - 2020 |
Keywords
- 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS
Fingerprint
Dive into the research topics of 'Sister Rod Destructive Examinations (FY20) Appendix C: Rod internal Pressure, void volume, and gas transmission tests'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver