Abstract
In preparation for SNS ring commissioning, a number of operational issues have been studied using the ORBIT Code and other simulations. These include beam injection without the use of time-dependent painting, detailed tracking through the extraction septum and ring-to-target transfer line (RTBT) with fully correct geometry, a worst case scenario for beam intensity at the target and extraction dump, quadrupole current constraints in the RTBT, quadrupole settings for RTBT fault studies, and studies of H0, H-, and circulating beam trajectories in the injection region. All the ORBIT studies incorporated detailed physics models including beam-foil interactions, symplectic single particle tracking, space charge and impedances, and losses due to apertures and collimation.
| Original language | English |
|---|---|
| Pages | 348-350 |
| Number of pages | 3 |
| State | Published - 2006 |
| Externally published | Yes |
| Event | 10th European Particle Accelerator Conference, EPAC 2006 - Edinburgh, United Kingdom Duration: Jun 26 2006 → Jun 30 2006 |
Conference
| Conference | 10th European Particle Accelerator Conference, EPAC 2006 |
|---|---|
| Country/Territory | United Kingdom |
| City | Edinburgh |
| Period | 06/26/06 → 06/30/06 |