Abstract
The beam test facility (BTF), which simulates front end of the Spallation Neutron Source (SNS), has been built at the SNS, and is preparing for commissioning. The BTF has been assembled and will operate in one of service buildings at the site. The 2.5 MeV proton beam, produced in the facility, will be stopped in the beam dump. In order to support BTF project from radiation protection site, neutronics simulations and activation analyses were performed to evaluate the necessary shielding around the facility and radionuclide inventory of the beam stop.
Original language | English |
---|---|
Article number | 02007 |
Journal | EPJ Web of Conferences |
Volume | 153 |
DOIs | |
State | Published - Sep 25 2017 |
Event | 13th International Conference on Radiation Shielding, ICRS 2016 and 19th Topical Meeting of the Radiation Protection and Shielding Division of the American Nuclear Society, RPSD 2016 - Paris, France Duration: Oct 3 2016 → Oct 6 2016 |