Risk informed licensing applications for nuclear power plants-An example application for ic systems

Ming Li, Norbert Carte, Steven Arndt, Michael Waters

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

This paper presents a process which the NRC technical branch staff follows to conduct a technical review for a risk informed completion time application. The discussion focuses on the evaluation of the consistency with the defense-in-depth philosophy as described in the RG1.174.

Original languageEnglish
Title of host publicationRAMS 2019 - 2019 Annual Reliability and Maintainability Symposium, Proceedings
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781538665541
DOIs
StatePublished - Jan 2019
Externally publishedYes
Event2019 Annual Reliability and Maintainability Symposium, RAMS 2019 - Orlando, United States
Duration: Jan 28 2019Jan 31 2019

Publication series

NameProceedings - Annual Reliability and Maintainability Symposium
Volume2019-January
ISSN (Print)0149-144X

Conference

Conference2019 Annual Reliability and Maintainability Symposium, RAMS 2019
Country/TerritoryUnited States
CityOrlando
Period01/28/1901/31/19

Keywords

  • Nuclear
  • Risk-Inform
  • Safety Related Instrumentation and Control Systems

Fingerprint

Dive into the research topics of 'Risk informed licensing applications for nuclear power plants-An example application for ic systems'. Together they form a unique fingerprint.

Cite this