R&D status of the 700 MHz, 1MW klystron for PEFP

  • Sang Ho Kim
  • , Bo Hyun Chung
  • , Jai Ha Jeon
  • , Jin Suk Hong
  • , Kang Ok Lee
  • , S. J. Noh
  • , Seung Kook Ko
  • , Kie Hyung Chung

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

KAPRA (Korea Accelerator and Plasma Research Association) are undertaking the first phase R&D for the 1 MW, CW 700 MHz klystron, which is targeting the future stage of the PEFP (Proton Engineering Frontier Project) accelerator at KAERI (Korea Atomic Energy Research Institute). The objectives of the first phase R&D are 1) setting up infra structures/procedures for the design and fabrication, 2) developing a prototype klystron for proofs of principles, and 3) making a performance test of the prototype at a reduced duty. The second phase R&D is supposed to cover full power, CW operation and reliability issues. In this paper, a summary of the R&D status during the first phase for PEFP 1 MW, 700 MHz klystron is reported.

Original languageEnglish
Title of host publicationProceedings of the Particle Accelerator Conference, PAC 2005
Pages3850-3852
Number of pages3
DOIs
StatePublished - 2005
Externally publishedYes
EventParticle Accelerator Conference, PAC 2005 - Knoxville, TN, United States
Duration: May 16 2005May 20 2005

Publication series

NameProceedings of the IEEE Particle Accelerator Conference
Volume2005

Conference

ConferenceParticle Accelerator Conference, PAC 2005
Country/TerritoryUnited States
CityKnoxville, TN
Period05/16/0505/20/05

Fingerprint

Dive into the research topics of 'R&D status of the 700 MHz, 1MW klystron for PEFP'. Together they form a unique fingerprint.

Cite this