R&D status of the 700 MHz, 1MW klystron for PEFP

Sang Ho Kim, Bo Hyun Chung, Jai Ha Jeon, Jin Suk Hong, Kang Ok Lee, S. J. Noh, Seung Kook Ko, Kie Hyung Chung

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

    Abstract

    KAPRA (Korea Accelerator and Plasma Research Association) are undertaking the first phase R&D for the 1 MW, CW 700 MHz klystron, which is targeting the future stage of the PEFP (Proton Engineering Frontier Project) accelerator at KAERI (Korea Atomic Energy Research Institute). The objectives of the first phase R&D are 1) setting up infra structures/procedures for the design and fabrication, 2) developing a prototype klystron for proofs of principles, and 3) making a performance test of the prototype at a reduced duty. The second phase R&D is supposed to cover full power, CW operation and reliability issues. In this paper, a summary of the R&D status during the first phase for PEFP 1 MW, 700 MHz klystron is reported.

    Original languageEnglish
    Title of host publicationProceedings of the Particle Accelerator Conference, PAC 2005
    Pages3850-3852
    Number of pages3
    DOIs
    StatePublished - 2005
    EventParticle Accelerator Conference, PAC 2005 - Knoxville, TN, United States
    Duration: May 16 2005May 20 2005

    Publication series

    NameProceedings of the IEEE Particle Accelerator Conference
    Volume2005

    Conference

    ConferenceParticle Accelerator Conference, PAC 2005
    Country/TerritoryUnited States
    CityKnoxville, TN
    Period05/16/0505/20/05

    Fingerprint

    Dive into the research topics of 'R&D status of the 700 MHz, 1MW klystron for PEFP'. Together they form a unique fingerprint.

    Cite this