Progress, status, and plans for the HRIBF project

D. K. Olsen, R. L. Auble, G. D. Alton, J. D. Bailey, M. R. Dinehart, C. L. Dukes, D. T. Dowling, D. L. Haynes, C. M. Jones, S. N. Lane, C. T. LeCroy, R. C. Juras, M. J. Meigs, G. D. Mills, S. W. Mosko, P. E. Mueller, S. N. Murray, B. A. Tatum, R. F. Welton, H. Wollnik

    Research output: Contribution to journalArticlepeer-review

    2 Scopus citations

    Abstract

    Over the last three years, the Holifield accelerator system has been reconfigured into a first-generation radioactive ion beam facility, the HRIBF, a national user facility for RIB research. The construction and reconfiguration have been completed and the equipment commissioning and beam development phases have started. The progress to date, the present status, and future plans will be given. The special problems connected with the production and acceleration of RIBs will be discussed.

    Original languageEnglish
    Pages (from-to)197-206
    Number of pages10
    JournalNuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
    Volume382
    Issue number1-2
    DOIs
    StatePublished - Nov 11 1996

    Funding

    * Managed by Lockheed Martin Energy Systems under contract No. DE-AC05-840R21400 with the U.S. Department of Energy. * Corresponding author. ’ Personal services subcontract.

    Fingerprint

    Dive into the research topics of 'Progress, status, and plans for the HRIBF project'. Together they form a unique fingerprint.

    Cite this