Abstract
The Electron Cyclotron system for ITER is an in-kind procurement shared between five parties and the total installed power will be 24 MW, corresponding to a nominal injected power of 20 MW to the plasma, with a possible upgrade up to 48 MW (corresponding to 40 MW injected). Some critical issues have been raised and changes are proposed to simplify these procurements and to facilitate the integration into ITER. The progress in the design and the integration of the EC system into the whole project is presented in this paper, as well as some issues still under studies and some recommendations made by external expert committees.
Original language | English |
---|---|
Pages (from-to) | 651-655 |
Number of pages | 5 |
Journal | Fusion Engineering and Design |
Volume | 84 |
Issue number | 2-6 |
DOIs | |
State | Published - Jun 2009 |
Keywords
- Electron Cyclotron
- Gyrotrons
- ITER
- Launcher