Preliminary Development of a Work Breakdown Structure (WBS) for Small Modular Reactors (SMRs)

  • Thomas J. Harrison
  • , Rebecca J. Moses
  • , George F. Flanagan

Research output: Other contributionTechnical Report

Abstract

In summary, this preliminary WBS serves as an initial basis for the capital cost component of the economic analysis of SMRs. This preliminary WBS comes from the known WBS for existing, large nuclear power plants and develops the methodology for accounting for the anticipated differences between the current large plants and the projected SMR designs.