TY - GEN
T1 - Power response optimization of inverter grid parallel operation using P-ω and Q-V curves and phase feeedback based on genetic algorithm
AU - Maia, Helder Zandonadi
AU - Pinto, João Onofre Pereira
AU - Coelho, Ernane Antônio Alves
PY - 2007
Y1 - 2007
N2 - The aim of this work is to optimize the response of a scheme to parallel an inverter to the grid. The approach not only is based on P-ω and Q-Vcurves, but also in phase angle feedback. This scheme requires determination of 4 parameters (Kd, Kp, Kv, ωf), which interfere in the power dynamic response (overshoot and rise time). Trial and error method was used in the past resulting in poor performance. In this work, genetic algorithm is used to find the parameters set that leads to near optimum response. A brief review of the paralleling approach and the GA based methodology is presented; simulation results are given showing its feasibility.
AB - The aim of this work is to optimize the response of a scheme to parallel an inverter to the grid. The approach not only is based on P-ω and Q-Vcurves, but also in phase angle feedback. This scheme requires determination of 4 parameters (Kd, Kp, Kv, ωf), which interfere in the power dynamic response (overshoot and rise time). Trial and error method was used in the past resulting in poor performance. In this work, genetic algorithm is used to find the parameters set that leads to near optimum response. A brief review of the paralleling approach and the GA based methodology is presented; simulation results are given showing its feasibility.
UR - http://www.scopus.com/inward/record.url?scp=50049099890&partnerID=8YFLogxK
U2 - 10.1109/IECON.2007.4460330
DO - 10.1109/IECON.2007.4460330
M3 - Conference contribution
AN - SCOPUS:50049099890
SN - 1424407834
SN - 9781424407835
T3 - IECON Proceedings (Industrial Electronics Conference)
SP - 1679
EP - 1684
BT - Proceedings of the 33rd Annual Conference of the IEEE Industrial Electronics Society, IECON
T2 - 33rd Annual Conference of the IEEE Industrial Electronics Society, IECON
Y2 - 5 November 2007 through 8 November 2007
ER -