Abstract
The Spallation Neutron Source accelerator systems will deliver a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an H- injector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. The 2.5 MeV beam from the Front End is accelerated to 87 MeV in the Drift Tube Linac, then to 186 MeV in a Coupled-Cavity Linac and finally to 1 GeV in the Superconducting Linac. With the completion of beam commissioning, the accelerator complex began operation in June 2006 and beam power is being gradually ramped up toward the design goal. Operational experience with the injector and linac will be presented including chopper performance, longitudinal beam dynamics study, and the results of a beam loss study.
Original language | English |
---|---|
Pages | 3530-3532 |
Number of pages | 3 |
State | Published - 2008 |
Event | 11th European Particle Accelerator Conference, EPAC 2008 - Genoa, Italy Duration: Jun 23 2008 → Jun 27 2008 |
Conference
Conference | 11th European Particle Accelerator Conference, EPAC 2008 |
---|---|
Country/Territory | Italy |
City | Genoa |
Period | 06/23/08 → 06/27/08 |