Abstract
The full complement of 169 pairs of niobium superconducting cavities has been installed in the CEBAF accelerator. This paper surveys the performance characteristics of these cavities in vertical tests, commissioning in the tunnel, and operational experience to date. Although installed performance exceeds specifications, and 3.2 GeV beam has been delivered on target, present systems do not consistently preserve the high performance obtained in vertical dewar tests as operational capability. The principal sources of these limitations are discussed.