TY - GEN
T1 - Overview of the Spallation Neutron Source Linac Low-Level RF control system
AU - Champion, M.
AU - Crofford, M.
AU - Kasemir, K.
AU - Ma, H.
AU - Piller, M.
AU - Doolittle, L.
AU - Ratti, A.
PY - 2005
Y1 - 2005
N2 - The design and production of the Spallation Neutron Source Linac Low-Level RF control system is complete, and installation will be finished in Spring 2005. The warm linac beam commissioning run in Fall 2004 was the most extensive test to date of the LLRF control system, with fourteen (of an eventual 96) systems operating simultaneously. In this paper we present an overview of the LLRF control system, the experience in designing, building and installing the system, and operational results.
AB - The design and production of the Spallation Neutron Source Linac Low-Level RF control system is complete, and installation will be finished in Spring 2005. The warm linac beam commissioning run in Fall 2004 was the most extensive test to date of the LLRF control system, with fourteen (of an eventual 96) systems operating simultaneously. In this paper we present an overview of the LLRF control system, the experience in designing, building and installing the system, and operational results.
UR - http://www.scopus.com/inward/record.url?scp=33847108147&partnerID=8YFLogxK
U2 - 10.1109/PAC.2005.1591483
DO - 10.1109/PAC.2005.1591483
M3 - Conference contribution
AN - SCOPUS:33847108147
SN - 0780388593
SN - 9780780388598
T3 - Proceedings of the IEEE Particle Accelerator Conference
SP - 3396
EP - 3398
BT - Proceedings of the Particle Accelerator Conference, PAC 2005
T2 - Particle Accelerator Conference, PAC 2005
Y2 - 16 May 2005 through 20 May 2005
ER -