Operational performance of the SNS LLRF interim system

  • Lawrence Doolittle
  • , Alessandro Ratti
  • , Marco Monroy
  • , Mark Champion
  • , Hengjie Ma

Research output: Contribution to conferencePaperpeer-review

9 Scopus citations

Abstract

A new approach has been taken to develop and build the Low-Level RF Control System for the SNS Front End and Linear Accelerators, as reported in a separate paper in this conference. An interim version, based on the proven LBNL MEBT design, was constructed to support shortterm goals and early commissioning of the Front End RFQ and DTL accelerators, while the final system is under development. Additional units of the interim system are in use at JLab and LANL for concept testing, code development, and commissioning of SNS SRF cryomodules. The conceptual design of the MEBT system had already been presented elsewhere, and this paper will address operational experiences and performance measurements with the existing interim system hardware, including commissioning results at the SNS site for the Front End and DTL Tank 3 together with operational results from the JLab test stand.

Original languageEnglish
Pages1464-1466
Number of pages3
StatePublished - 2003
EventPAC 2003 - Proceedings of the 2003 IEEE Particle Accelerator Conference - Portland, OR, United States
Duration: May 12 2003May 16 2003

Conference

ConferencePAC 2003 - Proceedings of the 2003 IEEE Particle Accelerator Conference
Country/TerritoryUnited States
CityPortland, OR
Period05/12/0305/16/03

Fingerprint

Dive into the research topics of 'Operational performance of the SNS LLRF interim system'. Together they form a unique fingerprint.

Cite this