TY - BOOK
T1 - Operational and Performance Monitoring of East Tennessee Technology Park Ponds—2023 Results
AU - Mathews, Teresa J.
AU - Jett, R. Trent
AU - Fortner, Allison M.
AU - Griffiths, Natalie A.
AU - Herold, Jamie M.
AU - Jones, Nikki J.
AU - Jones, Michael W.
AU - Darling, Sara E.
AU - Matson, P. G.
AU - Carter, Evin T.
AU - Ku, Peijia
PY - 2023
Y1 - 2023
N2 - Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee: the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from fiscal year (FY) 2023. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough. Operational monitoring ensures that ecological enhancement measures—including water quality, plant community, fish community, and wildlife actions—have been implemented as intended. Monitoring provides the information necessary to determine whether modifications are needed to attain the design end state (i.e., a heavily vegetated, clearwater pond dominated by sunfish with significantly diminished or at least downwardly trending PCB levels in fish). In FY 2023, fish removal efforts and vegetation planting primarily focused on the K-901-A Pond. These actions were implemented to help push the systems toward the desired end state. Descriptions of the various monitoring activities and preliminary 2023 results are provided in the following sections. An update on fish and plant management actions in FY 2023 is also included in this report. A summary of the more detailed information in this report will be presented as required in the upcoming Remediation Effectiveness Report.
AB - Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee: the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from fiscal year (FY) 2023. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough. Operational monitoring ensures that ecological enhancement measures—including water quality, plant community, fish community, and wildlife actions—have been implemented as intended. Monitoring provides the information necessary to determine whether modifications are needed to attain the design end state (i.e., a heavily vegetated, clearwater pond dominated by sunfish with significantly diminished or at least downwardly trending PCB levels in fish). In FY 2023, fish removal efforts and vegetation planting primarily focused on the K-901-A Pond. These actions were implemented to help push the systems toward the desired end state. Descriptions of the various monitoring activities and preliminary 2023 results are provided in the following sections. An update on fish and plant management actions in FY 2023 is also included in this report. A summary of the more detailed information in this report will be presented as required in the upcoming Remediation Effectiveness Report.
KW - 54 ENVIRONMENTAL SCIENCES
U2 - 10.2172/2007721
DO - 10.2172/2007721
M3 - Commissioned report
BT - Operational and Performance Monitoring of East Tennessee Technology Park Ponds—2023 Results
CY - United States
ER -