Abstract
The low-level RF (LLRF) control system for the Spallation Neutron Source has undergone some recent hardware changes. The intended Field and Resonance Control Module (FRCM) design has been re-vamped to minimize functionality and ease implementation. This effort spans a variety of disciplines, and requires parallel development with distinct interface controls. This paper will discuss the platform chosen, the design requirements that will be met, and the parallel development efforts on-going.
Original language | English |
---|---|
Pages | 3371-3373 |
Number of pages | 3 |
State | Published - 2003 |
Event | PAC 2003 - Proceedings of the 2003 IEEE Particle Accelerator Conference - Portland, OR, United States Duration: May 12 2003 → May 16 2003 |
Conference
Conference | PAC 2003 - Proceedings of the 2003 IEEE Particle Accelerator Conference |
---|---|
Country/Territory | United States |
City | Portland, OR |
Period | 05/12/03 → 05/16/03 |