Skip to main navigation Skip to search Skip to main content

Long-lead seasonal prediction of China summer rainfall using an EOF-PLS regression-based methodology

Research output: Contribution to journal › Article › peer-review

28 Scopus citations

Abstract

Considerable year-to-year variability of summer rainfall exposes China to threats of frequent droughts and floods. Objective prediction of the summer rainfall anomaly pattern turns out to be very challenging. As shown in the present study, the contemporary state-of-the-art dynamical models' 1-month-lead prediction of China summer rainfall (CSR) anomalies has insignificant skills. Thus, there is an urgent need to explore other ways to improve CSR prediction. The present study proposes a combined empirical orthogonal function (EOF)-partial least squares (PLS) regression method to offer a potential long-lead objective prediction of spatial distribution of CSR anomalies. The essence of the methodology is to use PLS regression to predict the principal component (PC) of the first five leading EOF modes of CSR. The preceding December-January mean surface temperature field [ST; i.e., SST over ocean and 2-m air temperature (T2m) over land] is selected as the predictor field for all five PCs because SST and snow cover, which is reflected by 2-m air temperature, are the most important factors that affect CSR and because the correlation between each mode and ST during winter is higher than in spring. The 4-month-lead forecast models are established by using the data from 1979 to 2004. A 9-yr independent forward-rolling prediction is made for the latest 9 yr (2005-13) as a strict forecast validation. The pattern correlation coefficient skill (0.32) between the observed and the 4-month-lead predicted patterns during the independent forecast period of 2005-13 is significantly higher than the dynamic models' 1-month-lead hindcast skill (0.04), which indicates that the EOF-PLS regression is a useful tool for improving the current seasonal rainfall prediction. Issues related to the EOF-PLS method are also discussed.

Original languageEnglish
Pages (from-to)1783-1796
Number of pages14
JournalJournal of Climate
Volume29
Issue number5
DOIs
StatePublished - 2016
Externally publishedYes

Funding

This work was jointly supported by the Atmosphere-Ocean Research Center (which is sponsored by Nanjing University of Information Science and Technology), the National Research Foundation of Korea through a Global Research Laboratory (GRL) grant of the Korean Ministry of Education, Science and Technology (MEST, 2011-0021927), and the NSFC Shandong Joint Fund for Marine Science Research Centers (Grant U1406401).We also acknowledge support from China Scholarship Council (CSC) and the International Pacific Research Center (IPRC).

Keywords

  • Climate prediction
  • Forecasting
  • Seasonal forecasting
  • Statistical forecasting

Fingerprint

Dive into the research topics of 'Long-lead seasonal prediction of China summer rainfall using an EOF-PLS regression-based methodology'. Together they form a unique fingerprint.

Cite this