T1 - Lifetime prediction of IGBT in a STATCOM using modified-graphical rainflow counting algorithm
AU - Gopireddy, Lakshmi
AU - Tolbert, Leon M.
AU - Ozpineci, Burak
PY - 2012
Y1 - 2012
N2 - Rainflow algorithms are one of the best counting methods used in fatigue and failure analysis [17]. There have been many approaches to the rainflow algorithm, some proposing modifications. Graphical Rainflow Method (GRM) was proposed recently with a claim of faster execution times [10]. However, the steps of the graphical method of rainflow algorithm, when implemented, do not generate the same output as the four-point or ASTM standard algorithm. A modified graphical method is presented and discussed in this paper to overcome the shortcomings of graphical rainflow algorithm. A fast rainflow algorithm based on four-point algorithm but considering point comparison than range comparison is also presented. A comparison between the performances of the common rainflow algorithms [6-10], including the proposed methods, in terms of execution time, memory used, and efficiency, complexity, and load sequences is presented. Finally, the rainflow algorithm is applied to temperature data of an IGBT in assessing the lifetime of a STATCOM operating for power factor correction of the load. From 5-minute data load profiles available, the lifetime is estimated to be at 3.4 years.
AB - Rainflow algorithms are one of the best counting methods used in fatigue and failure analysis [17]. There have been many approaches to the rainflow algorithm, some proposing modifications. Graphical Rainflow Method (GRM) was proposed recently with a claim of faster execution times [10]. However, the steps of the graphical method of rainflow algorithm, when implemented, do not generate the same output as the four-point or ASTM standard algorithm. A modified graphical method is presented and discussed in this paper to overcome the shortcomings of graphical rainflow algorithm. A fast rainflow algorithm based on four-point algorithm but considering point comparison than range comparison is also presented. A comparison between the performances of the common rainflow algorithms [6-10], including the proposed methods, in terms of execution time, memory used, and efficiency, complexity, and load sequences is presented. Finally, the rainflow algorithm is applied to temperature data of an IGBT in assessing the lifetime of a STATCOM operating for power factor correction of the load. From 5-minute data load profiles available, the lifetime is estimated to be at 3.4 years.
KW - Counting methods
KW - Rainflow Algorithm
KW - STATCOM
KW - failure analysis
KW - fatigue
KW - reactive compensation
UR - http://www.scopus.com/inward/record.url?scp=84872941420&partnerID=8YFLogxK
U2 - 10.1109/IECON.2012.6389349
DO - 10.1109/IECON.2012.6389349
M3 - Conference contribution
AN - SCOPUS:84872941420
SN - 9781467324212
T3 - IECON Proceedings (Industrial Electronics Conference)
SP - 3425
EP - 3430
BT - Proceedings, IECON 2012 - 38th Annual Conference on IEEE Industrial Electronics Society
T2 - 38th Annual Conference on IEEE Industrial Electronics Society, IECON 2012