Abstract
Various stochastic programming methods have been used to account for penetration of uncertain renewable energy generation in microgrids. However, these stochastic methods may be unnecessary. Energy storage combined with rescheduling based on a rolling time horizon gives a microgrid powerful tools to adapt to any unexpected events. Add to that the natural tendency to over-engineer new systems and one begins to wonder how much value can be gained by stochastic optimization over deterministic methods. We investigated this question by looking at an existing residential microgrid in Hoover, AL. We compare various stochastic approaches for scheduling with deterministic approaches and show that there is little value of using stochastic programming. Instead, we find that considering longer time horizons is a better use of computational resources.
Original language | English |
---|---|
Pages (from-to) | 493-508 |
Number of pages | 16 |
Journal | Energy Systems |
Volume | 13 |
Issue number | 2 |
DOIs | |
State | Published - May 2022 |
Funding
Notice: This manuscript has been authored by UT-Battelle, LLC under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy. The United States Government retains and the publisher, by accepting the article for publication, acknowledges that the United States Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce the published form of this manuscript, or allow others to do so, for United States Government purposes. The Department of Energy will provide public access to these results of federally sponsored research in accordance with the DOE Public Access Plan ( http://energy.gov/downloads/doe-public-access-plan )
Funders | Funder number |
---|---|
U.S. Department of Energy |
Keywords
- Energy management system
- Microgrids
- Rolling horizon
- Stochastic programming