Abstract
Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.
| Original language | English |
|---|---|
| Title of host publication | Proceedings of the 42nd International Symposium on Automation and Robotics in Construction, ISARC 2025 |
| Editors | Jiansong Zhang, Qian Chen, Gaang Lee, Vicente A. Gonzalez, Vineet R. Kamat |
| Publisher | International Association for Automation and Robotics in Construction (IAARC) |
| Pages | 280-287 |
| Number of pages | 8 |
| ISBN (Electronic) | 9780645832228 |
| DOIs | |
| State | Published - 2025 |
| Event | 42nd International Symposium on Automation and Robotics in Construction, ISARC 2025 - Montreal, Canada Duration: Jul 28 2025 → Jul 31 2025 |
Publication series
| Name | Proceedings of the International Symposium on Automation and Robotics in Construction |
|---|---|
| ISSN (Electronic) | 2413-5844 |
Conference
| Conference | 42nd International Symposium on Automation and Robotics in Construction, ISARC 2025 |
|---|---|
| Country/Territory | Canada |
| City | Montreal |
| Period | 07/28/25 → 07/31/25 |
Funding
This research was supported by the DOE Office of Energy Efficiency and Renewable Energy (EERE), Building Technologies Office, under the guidance of Sven Mumme, and used resources at the Building Technologies Research and Integration Center (BTRIC), a DOE-EERE User Facility at Oak Ridge National Laboratory.
Keywords
- accuracy
- automation
- installation
- prefabrication
- real-time
- time
Fingerprint
Dive into the research topics of 'Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver