Hydropower is undergoing technological innovation as future development increasingly targets low-head sites ('10 m), primarily through retrofits, rehabilitation, and upgrades of existing infrastructure. This shift toward smaller systems creates a timely opportunity: unlike conventional large projects, many emerging low-head technologies may be small enough for direct full-scale validation. Full-scale testing is particularly important for environmental mitigation technologies, including fish passage, sediment continuity, and water-quality improvements, whose performance is difficult to assess reliably using reduced-scale models. Yet adoption remains constrained by the limited risk-bearing capacity of small hydropower owners, discouraging manufacturers from bringing unvalidated technologies to market. This review and perspective paper examines hydropower trends driving innovation, selected emerging technologies, conventional testing methods, and current U.S. testing capabilities as a case study. We then evaluate the gap between existing capabilities and the needs of low-head powertrains and environmental mitigation measures. Many technologies exceed existing facility flow capacities; in the U.S., the highest combined head–flow capability is limited to 5.66 m3/s, compared with median and 90th-percentile low-head turbine-unit flows of 14.3 and 60 m3/s. To mitigate this gap, we advocate repurposing large, retired, or underused hydraulic infrastructure as full-scale testing facilities to reduce first-adoption risk and support sustainable low-head hydropower deployment.
| Original language | English |
|---|---|
| Article number | 105218 |
| Journal | Sustainable Energy Technologies and Assessments |
| Volume | 93 |
| DOIs | |
| State | Published - Sep 2026 |
Funding
This manuscript is based on research initially conducted by the first and corresponding authors during their time at Oak Ridge National Laboratory (ORNL). Financial support for this project was provided by U.S. Department of Energy (DOE) Hydropower and Hydrokinetic Office . The authors would like to acknowledge the valuable contributions of their colleagues who supported the early stages of this work: Dr. Carly Hansen, Megan Johnson, Dr. Somnath Basu, and Kyle DeSomber. This paper was co-authored by employees of ORNL , managed by UT-Battelle, LLC , under Contract No. DE-AC05-00OR22725 , and by employees of Pacific Northwest National Laboratory , managed by Battelle , under Contract No. DE-AC05-76RL01830 , both contracts with the U.S. DOE. Accordingly, the U.S. government retains and the publisher, by accepting the article for publication, acknowledges that the U.S. government retains a nonexclusive, paid-up, irrevocable, worldwide license to publish or reproduce the published form of this manuscript or allow others to do so, for U.S. Government purposes.
Keywords
- Environmental mitigation
- Facilities retrofit and repurpose
- Full-scale validation
- Hydropower future trends
- Low-head hydropower
- Scaling effects
- Testing infrastructure
Fingerprint