Abstract
In this work, we present preliminary estimates for electron cloud build-up and saturation for the ion ring of the Jefferson Laboratory Electron-Ion Collider (JLEIC) currently under development. Using the baseline ion ring design, we study the impact of various operational parameters on the behavior of the electron cloud for a 100 GeV proton beam, including estimated tune shifts.
Original language | English |
---|---|
Title of host publication | Proceedings of the 29th Linear Accelerator Conference, LINAC 2018 |
Publisher | JACoW Publishing |
Pages | 563-565 |
Number of pages | 3 |
ISBN (Electronic) | 9783954501946 |
DOIs | |
State | Published - 2020 |
Externally published | Yes |
Event | 29th International Linear Accelerator Conference, LINAC 2018 - Beijing, China Duration: Sep 16 2018 → Sep 21 2018 |
Publication series
Name | Proceedings of the 29th Linear Accelerator Conference, LINAC 2018 |
---|
Conference
Conference | 29th International Linear Accelerator Conference, LINAC 2018 |
---|---|
Country/Territory | China |
City | Beijing |
Period | 09/16/18 → 09/21/18 |
Funding
This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177. K. E. D. would like to thank LINAC’18 for conference support.