Abstract
We have manufactured a total of six β=0.64, 700-MHz 5-cell cavities. The APT (Accelerator Production of Tritium) specification requires Q0 > 5 × 109 at an accelerating field of 5 MV/m. So far, the results of vertical tests have shown maximum accelerating fields of 12 MV/m (peak surface field of 41 MV/m) and maximum low-field Q0 of 3.6 × 1010 at 2 K. The present limitations are available input power, field emission and quench. This type of cavities will also be used for an ADTF (Accelerator-Driven Test Facility) for AAA (Advanced Accelerator Applications) project.
Original language | English |
---|---|
Pages | 1119-1121 |
Number of pages | 3 |
State | Published - 2001 |
Externally published | Yes |
Event | 2001 Particle Accelerator Conference - Chicago, IL, United States Duration: Jun 18 2001 → Jun 22 2001 |
Conference
Conference | 2001 Particle Accelerator Conference |
---|---|
Country/Territory | United States |
City | Chicago, IL |
Period | 06/18/01 → 06/22/01 |