Abstract
Korea Accelerator and Plasma Research Association (KAPRA) is undertaking the first phase R&D for the 1 MW, CW 700 MHz klystron, which is targeting the future stage of the Proton Engineering Frontier Project (PEFP) accelerator at Korea Atomic Energy Research Institute (KAERI). The objectives of the first phase R&D are: (1) setting up all infra structures/procedures for the design and fabrication, (2) developing a prototype klystron for proofs of principles, and (3) making a performance test of the prototype at a reduced duty. The second phase R&D is supposed to cover full power, CW operation and reliability issues. A triode type electron gun, cavities, an output RF circuit, an RF window, a beam collector and an electro-magnet were designed to produce desired output rf power. Some parts were fabricated and tested, which is also briefly introduced in this paper.
Original language | English |
---|---|
Pages (from-to) | 230-234 |
Number of pages | 5 |
Journal | Current Applied Physics |
Volume | 6 |
Issue number | 2 |
DOIs | |
State | Published - Feb 2006 |
Externally published | Yes |
Event | Engineering Aspects of Nanomaterials and Technologies - Duration: Jan 24 2005 → Jan 27 2005 |
Keywords
- Accelerator
- Cavities
- Collector
- Electron gun
- Klystron
- RF window