Abstract
Long term plans for CEBAF at Jefferson Lab call for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of those plans, an Upgrade Cryomodule capable of providing more than three times the voltage of the original CEBAF cryomodule specification within the same length is under development. Development activities have been focused on critical areas thought to have maximum impact on the overall design. These have included the cavity structure, rf power coupling, cavity suspension, alignment, cavity tuning, and beamline interface. It has been found that all design and development areas are tightly coupled and can not be developed independently. Substantial progress has been made toward an integrated design for the Jefferson Lab Upgraded Cryomodule.
Original language | English |
---|---|
Pages | 934-936 |
Number of pages | 3 |
DOIs | |
State | Published - 1999 |
Externally published | Yes |
Event | The 18th Biennial Particle Accelerator Conference - New York, NY, USA Duration: Mar 27 1999 → Apr 2 1999 |
Conference
Conference | The 18th Biennial Particle Accelerator Conference |
---|---|
City | New York, NY, USA |
Period | 03/27/99 → 04/2/99 |