Abstract
Correction to: Nature Communicationshttps://doi.org/10.1038/s41467-024-52667-x, published online 03 October 2024 In this article some funding information was omitted. The correct version of the Acknowledgements section is: This work was carried out using an adaption of the C-model MCNP model that was developed as a collaborative effort between the AMEC company (international), Culham Centre for Fusion Energy (United Kingdom), Frascati Research Centre of the National Agency for New Technologies, Energy and Sustainable Economic Development (Italy), FDS Team of the Institute of Nuclear Energy Safety Technology (People’s Republic of China), ITER Organization (France), Japan Atomic Energy Agency in Naka (Japan), National Distance Education University (UNED) (Spain), Fusion for Energy (Spain) and University of Wisconsin–Madison (United States). This work was performed under ITER contract IO/19/CT/43-1948 between the ITER Organization and the consortium consisting of UNED and the companies Orano project and Jacobs (R.J., M.B., A.K., V.L., J.A., G.P., A.J.L.-R., P.M., M.D., P.G., J.S.). We appreciate the support given by the Comunidad de Madrid for funding under I + D en Tecnologías (TECHNOFUSIÓN (III)-CM, project S2018/EMT-4437) (R.J., M.B., A.K., V.L., J.A., G.P., A.J.L.-R., P.M., M.D., P.G., J.S.), by the Escuela Técnica Superior de Ingenieros Industriales-UNED 2022, 2023 and 2024 program (R.J., M.B., A.K., V.L., J.A., G.P., A.J.L.-R., P.M., M.D., P.G., J.S.), and by UNED for funding of the predoctoral contract (Formación Personal Investigador) (P.M., M.D., P.G.). We also appreciate the support given by the Ministry of Science, Innovation and Universities and the European Union—Next Generation EU for the funding of the “Ayudas Margarita Salas” contracts (G.P., J.A.) and “Juan de la Cierva 2022” contract (G.P.). The views expressed in this publication are the sole responsibility of the authors and do not necessarily reflect the views of Fusion for Energy or of the ITER Organization. Neither of these institutions nor any person acting on their behalf is responsible for the use that might have been made of the information in this publication. The content of this paper does not commit the ITER Organization to being a nuclear operator. We would like to thank Fabio Crameri for providing the Scientific color maps. These have been corrected in both the PDF and HTML versions of the Article.
Original language | English |
---|---|
Article number | 10645 |
Journal | Nature Communications |
Volume | 15 |
Issue number | 1 |
DOIs |
|
State | Published - Dec 2024 |
Funding
This work was carried out using an adaption of the C-model MCNP model that was developed as a collaborative effort between the AMEC company (international), Culham Centre for Fusion Energy (United Kingdom), Frascati Research Centre of the National Agency for New Technologies, Energy and Sustainable Economic Development (Italy), FDS Team of the Institute of Nuclear Energy Safety Technology (People\u2019s Republic of China), ITER Organization (France), Japan Atomic Energy Agency in Naka (Japan), National Distance Education University (UNED) (Spain), Fusion for Energy (Spain) and University of Wisconsin\u2013Madison (United States). This work was performed under ITER contract IO/19/CT/43-1948 between the ITER Organization and the consortium consisting of UNED and the companies Orano project and Jacobs (R.J., M.B., A.K., V.L., J.A., G.P., A.J.L.-R., P.M., M.D., P.G., J.S.). We appreciate the support given by the Comunidad de Madrid for funding under I\u2009+\u2009D en Tecnolog\u00EDas (TECHNOFUSI\u00D3N (III)-CM, project S2018/EMT-4437) (R.J., M.B., A.K., V.L., J.A., G.P., A.J.L.-R., P.M., M.D., P.G., J.S.), by the Escuela T\u00E9cnica Superior de Ingenieros Industriales-UNED 2022, 2023 and 2024 program (R.J., M.B., A.K., V.L., J.A., G.P., A.J.L.-R., P.M., M.D., P.G., J.S.), and by UNED for funding of the predoctoral contract (Formaci\u00F3n Personal Investigador) (P.M., M.D., P.G.). We also appreciate the support given by the Ministry of Science, Innovation and Universities and the European Union\u2014Next Generation EU for the funding of the \u201CAyudas Margarita Salas\u201D contracts (G.P., J.A.) and \u201CJuan de la Cierva 2022\u201D contract (G.P.). The views expressed in this publication are the sole responsibility of the authors and do not necessarily reflect the views of Fusion for Energy or of the ITER Organization. Neither of these institutions nor any person acting on their behalf is responsible for the use that might have been made of the information in this publication. The content of this paper does not commit the ITER Organization to being a nuclear operator. We would like to thank Fabio Crameri for providing the Scientific color maps.