Control system design and upgrade considerations for the Duke Free Electron Laser Laboratory

S. Hartman, V. N. Litvinenko, G. Swift, I. Pinayev, Y. Wu

Research output: Contribution to conferencePaperpeer-review

Abstract

The Duke Free Electron Laser Laboratory currently operates two FELs: the OK-4/Duke Storage Ring FEL, and the Mark III IR FEL. Both of these systems were among the early adopters of the Experimental Physics and Industrial Control System (EPICS). The Mark III EPICS control system was completed and operational in September, 1993. The Duke Storage Ring was commissioned in November of 1994 using EPICS. These control systems have proven to be very robust with high reliability over the intervening years. An overview of these current control systems and an upgrade strategy will be presented.

Original languageEnglish
Pages785-787
Number of pages3
StatePublished - 2001
Externally publishedYes
Event2001 Particle Accelerator Conference - Chicago, IL, United States
Duration: Jun 18 2001Jun 22 2001

Conference

Conference2001 Particle Accelerator Conference
Country/TerritoryUnited States
CityChicago, IL
Period06/18/0106/22/01

Fingerprint

Dive into the research topics of 'Control system design and upgrade considerations for the Duke Free Electron Laser Laboratory'. Together they form a unique fingerprint.

Cite this