Abstract
Two independent magnet and vacuum control systems were implemented in the Low-Energy Demonstration Accelerator (LEDA) facility. The first one, for the High-Energy Beam Transport (HEBT) in context of the Accelerator Production of Tritium (APT) project, used the in-house Experimental Physics and Industrial Control System (EPICS). The second one, for the high-power proton beam-halo experiment (HALO-Channel) as an extension to the existing accelerator, is based on commercial products (National Instruments, LabVIEW). This paper will evaluate our experience during implementation, operation, and maintenance of these systems. It will include a discussion of various problems encountered and solutions implemented.
Original language | English |
---|---|
Pages | 800-802 |
Number of pages | 3 |
State | Published - 2001 |
Externally published | Yes |
Event | 2001 Particle Accelerator Conference - Chicago, IL, United States Duration: Jun 18 2001 → Jun 22 2001 |
Conference
Conference | 2001 Particle Accelerator Conference |
---|---|
Country/Territory | United States |
City | Chicago, IL |
Period | 06/18/01 → 06/22/01 |