T1 - Commissioning strategies and methods
AU - Galambos, John
PY - 2013
Y1 - 2013
N2 - Accelerator beam commissioning is a challenging and exciting period. It is generally the first integrated operation of the many systems in an accelerator and, most importantly, of the beam. First, general preparation is discussed. Then general methods for initial beam commissioning are described, including methods for transverse and longitudinal beam set-up. The particular emphasis here is on tuning methods for linear accelerators.
AB - Accelerator beam commissioning is a challenging and exciting period. It is generally the first integrated operation of the many systems in an accelerator and, most importantly, of the beam. First, general preparation is discussed. Then general methods for initial beam commissioning are described, including methods for transverse and longitudinal beam set-up. The particular emphasis here is on tuning methods for linear accelerators.
UR - http://www.scopus.com/inward/record.url?scp=84883114914&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:84883114914
SN - 9789290833840
T3 - CERN Accelerator School: High Power Hadron Machines, CAS 2011 - Proceedings
SP - 465
EP - 480
BT - CERN Accelerator School
T2 - CERN Accelerator School: High Power Hadron Machines, CAS 2011
Y2 - 24 May 2011 through 2 June 2011
ER -