Abstract
This study presents a reduced-form model to support a better understanding of the capacity potential and drivers of costs for hydropower development at U.S. non-powered dams (NPD), which are existing dams that are not currently used for hydropower. With information on nineteen reference sites, a set of reduced-form design and cost equations were estimated to enable rapid assessments of aggregate costs and their components for a large number of NPD sites. The model was then applied to 36,000+ potential U.S. NPD sites using the limited data commonly available. Although the cost estimates span a wide range, there exists a significant amount of U.S. NPD hydropower capacity potential, which are considered cost-competitive in the current market using baseline technologies.
| Original language | English |
|---|---|
| Place of Publication | United States |
| DOIs | |
| State | Published - Sep 2024 |
Keywords
- 13 HYDRO ENERGY
Fingerprint
Dive into the research topics of 'A Reduced-form Cost Model for Prefeasibility Analysis of Hydropower at Non-Powered Dams'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver