A case study of modern PLC and LabVIEW controls: Power Supply Controls for the ORNL ITER ECH test stand

Alan M. Barker, Stephen M. Killough, Timothy S. Bigelow, John A. White, John K. Munro

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Scopus citations

Abstract

Power Supply Controls are being developed at Oak Ridge National Laboratory (ORNL) to test transmission line components of the Electron Cyclotron Heating (ECH) system, with a focus on gyrotrons and waveguides, in support of the International Thermonuclear Experimental Reactor (ITER). The control is performed by several Programmable Logic Controllers (PLC's) located near the different equipment. A technique of Supervisory Control and Data Acquisition (SCADA) is presented to monitor, control, and log actions of the PLC's on a PC through use of Allen Bradley's Remote I/O communication interface coupled with an Open Process Control/Object Linking and Embedding [OLE] for Process Control (OPC) Server/Client architecture. The OPC data is then linked to a National Instruments (NI) LabVIEW system for monitoring and control. Details of the architecture and insight into applicability to other systems are presented in the rest of this paper. Future integration with an EPICS (Experimental Physics Industrial Control System) - based mini-CODAC (Control, Data Access and Communication) SCADA system is under consideration, and integration considerations will be briefly introduced.

Original languageEnglish
Title of host publication2011 Future of Instrumentation International Workshop, FIIW 2011 - Proceedings
Pages1-4
Number of pages4
DOIs
StatePublished - 2011
Event2011 Future of Instrumentation International Workshop, FIIW 2011 - Oak Ridge, TN, United States
Duration: Nov 7 2011Nov 8 2011

Publication series

Name2011 Future of Instrumentation International Workshop, FIIW 2011 - Proceedings

Conference

Conference2011 Future of Instrumentation International Workshop, FIIW 2011
Country/TerritoryUnited States
CityOak Ridge, TN
Period11/7/1111/8/11

Keywords

  • ITER
  • LabVIEW
  • OPC
  • PLC
  • Remote I/O

Fingerprint

Dive into the research topics of 'A case study of modern PLC and LabVIEW controls: Power Supply Controls for the ORNL ITER ECH test stand'. Together they form a unique fingerprint.

Cite this