Projects per year
Search results
-
Active
Cost Compression for Multifamily Heat Pump Water Heaters
Rendall, J. (PI)
Office of Energy Efficiency and Renewable Energy
01/1/23 → 01/1/26
Project: Research
-
Next-Generation Domestic Refrigerator with Unprecedented Performance using Isobutane as Refrigerant
Nawaz, K. (PI)
Office of Energy Efficiency and Renewable Energy
09/30/22 → 09/30/25
Project: Research
-
Next-Generation Domestic Refrigerator with Unprecedented Performance using Isobutane as Refrigerant
Nawaz, K. (PI)
Office of Energy Efficiency and Renewable Energy
09/30/22 → 09/30/25
Project: Research
-
High-Efficiency Refrigerator with Cold Energy Storage Enabling Demand Flexibility
Gao, Z. (PI)
Office of Energy Efficiency and Renewable Energy
09/1/22 → 09/30/25
Project: Research
-
High-Temperature Heat Pump for Commercial Space and Water Heating
Nawaz, K. (PI)
Office of Energy Efficiency and Renewable Energy
04/1/22 → 06/30/25
Project: Research
-
Multifunctional Equipment for Direct Decarbonization with Improved Indoor Air Quality
Nawaz, K. (PI)
Office of Energy Efficiency and Renewable Energy
03/1/22 → 12/31/25
Project: Research
-
Analysis of Frost Formation and Novel Defrost Techniques for Commercial Refrigeration Applications
Wang, P. (PI)
Office of Energy Efficiency and Renewable Energy
10/1/21 → 12/31/24
Project: Research
-
Thermoelectric Clothes Dryer
Gluesenkamp, K. (PI)
Office of Energy Efficiency and Renewable Energy
05/3/19 → …
Project: Research
-
Finished
PoolHT150 – Pool Boiling Heat Transfer for Refrigerants with GWP < 150
Yang, C.-M. (PI)
Office of Energy Efficiency and Renewable Energy
05/1/22 → 04/30/24
Project: Research
-
l-Ce Alloy Based Compact Heat Exchanger for Refrigerant Charge Reduction and Unprecedented Durability
Brechtl, J. (PI)
Office of Energy Efficiency and Renewable Energy
01/1/22 → 03/31/24
Project: Research
-
Novel Compact Flooded Evaporators for Commercial Refrigeration
Nawaz, K. (PI)
Office of Energy Efficiency and Renewable Energy
01/1/21 → 03/31/24
Project: Research
-
Flexible HPWH with Embedded Energy Storage
Sun, J. (PI)
Office of Energy Efficiency and Renewable Energy
12/1/20 → 06/30/24
Project: Research
-
120 V Heat Pump Water Heater Replacement Solution for 30- to 40-Gallon Gas Water Heaters
Gluesenkamp, K. (PI)
10/1/20 → 11/30/23
Project: Research
-
120 V Heat Pump Water Heater Replacement Solution for 30- to 40-Gallon Gas Water Heaters
Gluesenkamp, K. (PI)
Office of Energy Efficiency and Renewable Energy
10/1/20 → 11/30/23
Project: Research
-
Demonstration of Direct Air Capture (DAC) of CO2 with Building Air Handling Equipment
Nawaz, K. (PI)
National Energy Technology Laboratory
08/1/20 → 07/31/22
Project: Research
-
High Temperature Heat Exchanger for Natural Gas-Based Heat Pump Technology and Modular Power Generation
Nawaz, K. (PI)
Office of Energy Efficiency and Renewable Energy
06/1/20 → 05/31/23
Project: Research
-
LNG Based Energy Storage Concept for Behind the Meter Energy Storage
Nawaz, K. (PI)
National Energy Technology Laboratory
06/1/20 → 12/31/21
Project: Research
-
Separate Sensible and Latent AC System
Li, K. (PI)
Office of Energy Efficiency and Renewable Energy
10/1/19 → 03/31/24
Project: Research
-
A High-Efficiency Natural Gas–Fired Boiler for Residential and Light Commercial Applications
Nawaz, K. (PI)
Office of Energy Efficiency and Renewable Energy
06/1/19 → 05/31/22
Project: Research
-
Low-Cost, High-Performance Polymer Composite Heat Exchangers Produced by Additive Manufacturing
Nawaz, K. (PI)
Office of Energy Efficiency and Renewable Energy
10/1/18 → 09/30/21
Project: Research
-
A Natural Gas-Driven Highly Efficient Thermo-Vacuum Clothes Dryer
Nawaz, K. (PI)
Office of Energy Efficiency and Renewable Energy
10/1/18 → 09/30/21
Project: Research
-
A Natural-gas based High Efficiency Combined Thermo-chemical Affordable Reactor (NECTAR)
Nawaz, K. (PI)
Advanced Research Projects Agency - Energy
06/19/18 → 06/19/21
Project: Research