Description
Two three-component dense seismic arrays were deployed above an active limestone mine in Pleasant Gap, Pennsylvania; one in the fall and one in the spring of 2023. Each campaign lasted approximately four weeks and included 80 to 100 seismic stations with stations spaced between 100 and 400 meters apart. Each campaign also included several small dense seismic arrays. Two types of seismic stations were deployed including FairfieldNodal ZLand 3C All-in-One seismometers and Geospace 3C GS-ONE geophone paired with GSX3 and GSX4 dataloggers. This dataset includes ~ 4 TB of three-component continuously recorded seismic data in the miniseed format data from both campaigns as well as a readme file for the data structure.